ASIA VICTOR (M) SDN BHD v 1. ) RHYTHM AGENCIES SDN BHD 2. ) Kashminder Singh A/l Josbir Singh (Defendan Pertama Dalam Tuntutan Balas) 3. ) PETROBANQ HOLDING SDN BHD (DEFENDAN KETIGA DALAM TUNTUTAN BALAS)

ba-22ncc-41-04-2021 High Court (Mahkamah Tinggi) 4 May 2025 • BA-22NCC-41-04/2021 • 45 min read
17 cases cited (0 SG, 17 foreign)

Outcome

Tuntutan ditolak dengan kos RM20,000.00 tertakluk kepada alokator. b) Tuntutan balas oleh Rhythm Agencies Sdn Bhd dibenarkan sebahagian, iaitu – (i) Tuntutan terhadap Kashminder Singh dan Asia Victor dibenarkan setakat jumlah komisen yang telah diterima. (ii) Tuntutan terhadap Petrobanq Holdings Sdn Bhd dibenarkan bagi baki setelah ditolak bayaran kepada Asia Victor Sdn Bhd. (iii) Faedah 5% atas RM324,000 hendaklah dibayar oleh Petrobanq Holdings Sdn Bhd kepada Rhythm Agencies Sdn Bhd dari tarikh pemfailan saman sehingga penyelesaian penuh.

Quoted verbatim from the judgment of High Court (Mahkamah Tinggi) (ba-22ncc-41-04-2021). Read the full judgment on the official Malaysia Courts portal for the complete decision.

Catchwords

BICARA: Tuntutan plaintif terhadap defendan untuk deklarasi berkaitan perjanjian membekal sarung tangan nitrile selain pampasan tidak melebihi RM2,000,000 bagi kerugian dan kerosakan yang dialami – Sama ada tindakan defendan menamatkan perjanjian sebagai tidak sah kerana perjanjian tidak memperuntukkan terma pembatalan – Defendan patut dihalang daripada mengeluarkan notis penggulungan berkanun terhadap plaintif – Tuntutan balas oleh defendan untuk pemulangan wang deposit dibawah perjanjian pembekalan sarung tangan nitrile terhadap plaintif dan pihak ketiga selain gantirugi punitif. UNDANG-UNDANG KONTRAK: Sama ada wujud perjanjian mengikat antara pihak-pihak – Sama ada perjanjian pembekalan sarung tangan nitrile antara pihak-pihak telah dibatalkan dan adakah ia mengikat Petrobanq – Sama ada Rhythm Agencies mempunyai kausa tindakan terhadap Asia Victor Sdn Bhd, Kashminder dan Petrobanq – Penerimaan wang deposit tidak dinafikan – Petrobanq selaku principal kepada Asia Victor Sdn Bhd telah menerima wang deposit dan komisen telah dibayar kepada Kashminder – Menilai tujuan dan terma kontrak dan keperluan menilai dokumen kontemporari dan keterangan lisan – Wujud kegagalan membekalkan dokumen pengesahan produk yang dipersetujui untuk dibekalkan – Persetujuan Petrobanq mengembalikan wang deposit – Wang depoit gagal dikembalikan meskipun telah berulang kali dijanjikan - Pelaksanaan kontrak - Seksyen 56(1) Akta Kontrak 1950 UNDANG-UNDANG KONTRAK: Hubungan agen dan prinsipal antara Petrobanq dan Asia Victor Sdn Bhd. TORT: Sama ada alegasi pemalsuan dibuktikan – Sama ada tuntutan Rhythm Agencies terhadap Petrobanq adalah pramatang. EKUITI: Sama ada perintah menahan defendan dengan sendirinya, dan/atau melalui pegawainya termasuk Alvin Ling atau ejennya dari mengeluarkan notis penggulungan berkanun; dan/atau menyebabkan petisyen penggulungan diajukan terhadap plaintif – Prinsip ekuiti tidak boleh mengatasi peruntukan undang-undang nyata. TATACARA SIVIL: Pembuktian tuntutan pampasan – Halangan meletakkan nilai bagi gantirugi am – Aturan 18 kaedah 12(1A) KKM 2012 TATACARA SIVIL: Tiada bayaran fi Mahkamah bagi tuntutan balas Kashminder – Kertas kausa yang hendak difailkan dibayar dengan fi Mahkamah sebagaimana dalam Appendix B - Tuntutan balas yang difailkan tanpa fi Mahkamah bukan sebahagian daripada kertas kausa yang sah - Aturan 91 kaedah 1 KKM 2012 UNDANG-UNDANG KETERANGAN: Beban bukti – Seksyen 101, 102 dan 103 Akta Keterangan 1950.

Practice Areas

Judges (1)

Counsel (5)

Parties (2)

Case Significance

Illustrates how a court unwinds a terminated glove-supply arrangement by tracing and recovering the deposit and commissions from the parties who received them, apportioning liability across the counterclaim defendants while declining to award punitive damages.

This decision of the High Court of Malaya at Shah Alam resolves a commercial dispute arising from an agreement to supply nitrile gloves, together with a counterclaim. In the original action the plaintiff, Asia Victor (M) Sdn Bhd, sought declarations relating to the supply agreement and compensation not exceeding RM2,000,000 for loss and damage, contending among other things that the termination of the agreement was invalid because the agreement contained no cancellation term and that the defendant should be restrained from issuing a statutory winding-up notice. The defendant, Rhythm Agencies Sdn Bhd, counterclaimed against the plaintiff and two further parties — an individual and a third company, Petrobanq Holdings Sdn Bhd — seeking the return of a deposit of RM324,000 paid under the nitrile-glove agreement, which it said had been terminated on account of fraud, together with punitive damages.

After a full trial the court dismissed the plaintiff's claim with costs of RM20,000. On the counterclaim, it found on the balance of probabilities that Rhythm Agencies was entitled to succeed in part: the claim against the individual and against Asia Victor was allowed to the extent of the commission each had received; the claim against Petrobanq Holdings was allowed for the balance of the deposit after deducting the payment made to Asia Victor, with interest at 5% on RM324,000 from the filing of the writ until full settlement, and a penalty of RM32,400 with interest was also ordered. The claim for punitive damages was refused, and a counterclaim brought by the individual first defendant to the counterclaim against the plaintiff was dismissed. All parties, dissatisfied in one respect or another, filed appeals. In reaching these conclusions the court applied the ordinary balance-of-probabilities standard and traced the flow of money between the parties rather than treating the corporate structures as a barrier to recovery. The judgment illustrates how a court unwinds a terminated supply arrangement, recovering deposits and commissions from the parties who actually received them while declining to award punitive damages absent the exceptional conduct such an award requires.

What happened to the plaintiff's claim and the counterclaim?

The court dismissed the plaintiff's claim over the nitrile-glove supply agreement with costs of RM20,000, and allowed the defendant's counterclaim in part. It ordered the recovery of commissions from the individual and from the plaintiff, and recovery of the balance of the RM324,000 deposit from Petrobanq Holdings Sdn Bhd with 5% interest, together with a penalty of RM32,400 and interest, while refusing punitive damages.

How was the deposit dealt with among the parties?

The court traced the RM324,000 deposit, allowing the counterclaim against Petrobanq Holdings Sdn Bhd for the balance after deducting the payment that had been made to Asia Victor, with 5% interest from the filing of the writ to full settlement, and allowing recovery against the individual and Asia Victor to the extent of the commission each had received. The individual's own counterclaim against the plaintiff was dismissed.

Cases Cited (17)

MY (17)
[1988] 1 MLJ 178 [1988] 3 MLJ 352 [1994] 1 MLJ 740 [1995] 3 MLJ 189 [1996] 1 MLJ 309 [1998] 6 MLJ 193 [2004] 2 CLJ 707 [2004] MLJU 759 [2006] 2 CLJ 723 [2010] 3 MLJ 827 [2014] 1 MLJ 894 [2015] 7 CLJ 584 [2016] 5 MLJ 1 [2019] MLJU 1588 [2020] MLJU 572 [2021] MLJU 1234 [2023] 3 MLJ 829

Judgment

Read the full judgment on the official Malaysia Courts portal.

Read on eJudgment

Source: eJudgment (ba-22ncc-41-04-2021)